Donnan/COBE Project: Apr 2023

Posted on: April 1, 2023
By Larry Stoudenmire, larry.stoudenmire@ngu.edu

The demolition worked slowed in April which made way for mechanical work to start along with the early stages of interior framing. Concrete was cut and removed to provide access for plumbing and electrical upgrades. Indoor HVAC systems are in the process of being installed while the exterior walls of the building are opened as part of the significant exterior renovation work.

  • All
  • interior
  • exterior

 

© North Greenville University. All Rights Reserved. | Accessibility Statement

North Greenville University (NGU) admits students of any race, color, national and ethnic origin to all the rights, privileges programs, and activities generally accorded or made available to students at the school. It does not discriminate on the basis of race, color, national and ethnic origin in the administration of its educational policies, admissions policies, scholarship and loan programs, and athletic and other school-administered programs.